Starting point
Electricity bill up 25% in six months.
Actions
Compressed-air leak repairs, set pressure lowered from 8 to 6.5 bar and night cleaning moved off-peak.
Result
18% lower consumption and payback under four months.
Suggested actions
- Lower compressor set pressure step by step and monitor the effect on production
Possible causes
- Widespread compressed-air leaks