Case studyApproved

Case study: an 18% energy cut at a food plant

How a 60-person plant reduced its electricity bill in three months with leak repairs and load shifting.

23 Aug 20264 minValid until 3 Oct 2027

Starting point

Electricity bill up 25% in six months.

Actions

Compressed-air leak repairs, set pressure lowered from 8 to 6.5 bar and night cleaning moved off-peak.

Result

18% lower consumption and payback under four months.

Suggested actions

  • Lower compressor set pressure step by step and monitor the effect on production

Possible causes

  • Widespread compressed-air leaks
  • Set pressure higher than needed
Source: Hamyar editorial team#Energy

Facing a similar problem?

Submit it to get tailored guidance and the right expert.

Submit a problem