Preparing your business for power outages

Production planning, equipment protection and backup power during scheduled outages.

11 Aug 20265 minValid until 3 Oct 2027

Scheduling

Get the published outage schedule and plan production around it.

Protect equipment

Use UPS units and surge protection for sensitive controls.

Backup power

Size generators for critical loads, not the whole plant.

Suggested actions

  • List your critical loads
  • Align production with the outage schedule
  • Add UPS units for control equipment

Possible causes

  • Grid constraints at peak hours
  • Voltage swings and insufficient equipment protection

Required documents

  • Published outage schedule
  • List of critical equipment

Warnings

  • Connecting a generator without a proper transfer switch is dangerous